all the joists – 1st and 2nd floor – were either replaced with new or sistered up to make them level, and a new subfloor laid on each level.

CTP iPhone 091314 071CTP iPhone 091314 068CTP iPhone 091314 075  CTP iPhone 091314 065       CTP iPhone 091314 070 CTP iPhone 091314 079CTP iPhone 091314 067CTP iPhone 091314 072

at its worst point, there was something like a 4″ sag in the middle of the joist, but most were only about 2″ lower in the middle than on the ends.